PNS Airport                      Project Titan Element 2

on this page

Pensacola International Airport is one of five major airports in North Florida, serving more than three million passengers annually. To expand aircraft operations and enhance economic resilience in Northwest Florida, the City of Pensacola is embarking on Element 2 of Project Titan. This design-build project will increase the size and capacity of existing maintenance, repair and overhaul (MRO) facilities and operations located in the northwest quadrant of the airport. It is also part of the development of a four-hangar MRO campus projected to create over 1,700 jobs and provide individuals with opportunities for career advancement and financial growth. The MRO campus is also projected to generate 60 additional aircraft operations by 2029.  

Our team is helping the airport further its commitment to fostering innovation and economic growth in the region by providing design criteria professional and program management services. These services include developing and maintaining the project schedule and budget along with collecting detailed site information. In addition, we are working with the MRO tenant to assess design needs and update cost estimates so they fit within the project’s budget. We are also creating a detailed design-criteria package, assisting with the procurement of the design-build team, and managing design and construction. This includes performing reviews and conducting inspections.

The second phase of Project Titan encompasses the construction of:

  • A 130,000 square-foot hangar and a 75,000 square-foot hangar to support MRO operations
  • Automobile access roadways, including intersection improvements, and landside parking areas used for supporting facility operations
  • Aircraft parking aprons required for accessing and supporting the MRO hangars, general airport overflow and overnight commercial aircraft parking
  • An aircraft wash-rack apron to support proposed MRO functions
  • A 75-foot-wide aircraft taxilane connecting the new aprons to the airfield
  • Stormwater management systems
  • A new perimeter fence, gates and utilities

Element 1 of Project Titan was completed in October 2022 and featured the development of a cutting-edge, 177,000 square-foot MRO facility to accommodate large aircraft, such as the Boeing 777 and Airbus A300. In July 2023, it received the Commercial Service Airport Project of the Year award from the Florida Department of Transportation. We served as the designer of record on the project.

DISCLAIMER

Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.

AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.

BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.

Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.

The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.

The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.



Downloads

Trade releases

Explore further