The digital landscape is evolving at an ever-increasing pace, alongside the advancing technical requirements of the data centres powering the AI revolution. Future-proofing plans for the next wave of digital transformation is key, explains Ceri Jones, Operations Director, Mission Critical team.
The exponential rise in AI, cloud and edge computing has placed data centres as the backbone of global connectivity. Delivering the infrastructure to meet this growing demand is central to ambitious government plans world-wide, yet delivering these mission-critical facilities remains a challenge.
Alongside supply-chain disruptions and lengthy lead times for power connection, developers must navigate an ever-evolving ecosystem and future-proof designs as the pace of technological developments continues and the breadth of potential end-users widens.
The average data centre takes more than three years from design to delivery: a long time in technology. Take ChatGPT; first released in 2022, it sparked a major increase in intensive processing and data consumption as generative AI models become increasingly commonplace. These shifts also impact the design and performance of data centres to accommodate new and intensive resources.
Inevitably, the fear of locking in redundant technology specifications is a pressing concern across the market. Despite the growing demand for data storage, developers must ensure the specification of facilities remain as broad and wide as possible.
To avoid delays in programmes and capitalise on growing need for new facilities, developers can adopt future-proofing strategies to maintain momentum in new facility development and focus on greater cost intelligence to navigate volatility and ensure efficient programme delivery.
Design Flexibility
With the rise of AI and edge computing, data centres must now support high-density compute environments and ultra-low latency. Design flexibility is a cornerstone of an effective future-proofing strategy, to ensure spaces are future market responsive and can accommodate a wide range of hyperscale and colocation requirements.
Factoring in the unique demands of GPU-intensive workloads, cooling systems, and edge node deployments into planning stages ensures readiness for the next wave of digital transformation, but developers must consider operational resilience as well as adaptability.
Sustainability is no longer optional. On-site power sources, renewable technologies and micro grid solutions enhance power resilience while aligning with carbon reduction mandates, as well as appealing to a wider range of end users with broader ESG requirements. Long-term planning, aligned to land availability, will also ensure developers are well prepared to capitalise on new generation technologies that could positively impact both current and future schemes.
Beyond power supply, circular economy principles—designing for disassembly, material reuse, and lifecycle optimisation - not only reduces environmental impact but also unlocks long-term value. In one initiative, we explored how waste heat from data centres could be harnessed to power nearby buildings—creating a local heat network that enhances both sustainability and community benefit.
The complex mechanical and electrical (M&E) systems running through data centres also need careful planning from the offset: mapping these effectively will ensure flexibility but retain energy-efficient, cost-effective M&E solutions that reduce operational expenditure and avoid cost-overruns: M&E systems can account for up to 60% of total construction costs.
Real-Time Intelligence in a Volatile World
In an era of geopolitical uncertainty and supply chain disruption, real-time cost information is vital to navigate volatility and retain visibility of positions to forecast out-turn construction costs and programme durations with confidence.
To build resilient cost strategies, cost intelligence should track commodity pricing, logistics constraints, and regional labour trends: combining multiple datasets and forecasts generates strategic foresight to make informed decisions early—when they matter most.
Procurement is equally vital. With lead times for critical equipment often exceeding 40 weeks, early engagement with suppliers is critical. Aligning project scale, risk, and delivery models with procurement strategies – from framework agreements to modular solutions - ensures not only timely delivery but also quality and cost control.
From Complexity to Competitive Advantage
Ultimately, the success of a data centre project hinges on clarity of scope, intelligent design, and strategic execution.
The opportunities for competitive advantage are vast: maintaining pace of programmes within controlled cost frameworks will ensure greater availability of data space as demand increases. From feasibility to commissioning, a structured approach ensures every phase is optimised for cost, time, and performance and ensures programmes are adaptable and resilient in the face of evolving technological demands.
Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.
AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.
BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.
Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.
The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.
The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.